Modular Design and Fabrication

15 years experience working directly on Design for Manufacture buildings as designers and fabricators.

Members of our team were also involved with one of the largest Level 2 BIM projects using DfMA assembly design at the time for SPB Renovation in St. Peterburg Russia, working within HKR Architects on a project called Gutenborg which was one of 22 sites across St Petersburg designed to rehouse 400,000 people, due the crumpling housing stock which have passed their useable life state.

Design intent was for an innovative chassis structure used for stair and lift cores. This was developed by primary architects Brydenwood with MACE, the same team, that lead the London 2012 Olympic Village schemes with whom we supported .Use of MMC (Modern Methods of Construction) was desired with minimum 50 year building life spaces to be achieved.

We also developed prototype dwellings for the UK market including testing with the BRE, prototyping of the assemblies within factory conditions. The dwellings were designed for code for sustainable homes level 6.

In the centre of London, we have completed a number of office projects, one at Moorgate which involved pre assembled roofing cassette panels, incorporating sedum planning.  Another 8 storey building near Chancery Lane was completed with a unitized curtain walling system from Italian based suppliers incorporating GRC light weight cladding.

  • Modular Housing and Prototyping including testing
  • Modular bathroom pods of variable types including floorless pods, fabricated in steel and lightweight concrete

  • Cross laminated timber floor and wall systems used for office and school buildings

  • SIP panels used for roof to domestic dwellings

  • Pre assembled sloped completed roof cassettes at the Moorgate London

  • Modular packaged electrical generator and distribution board containers for the Data environment

  • Unitized curtain walling systems with integrated GRC facade panelling systems

  • Twin Wall precast concrete and flat slab structures such as 420 apartment units in Dublin, with post tensioned basement construction.

  • Modular 3d facade components

Let's talk...

Our experienced team would love to hear about your project and discuss how we can help