This project was a research and development study on the design and prototype building of modular homes for construction in the UK. This typically developed a standard semidetached dwelling, into container sized boxed which could be readily transported.
The target was ultimately a 90% completed dwelling before arriving onto site. The balance of the work would be completed on site. The study involved collaboration with the following design standards and authorities:
- Bullets to go here